Installation Requirements

Area Requirements


Minimum of 130-150 square meters,
or approximately 200 square meters when including a dining area.


Minimum Ceiling Height


Minimum of 4 meters if excavation up to 2 meters is possible. If excavation is not possible, a minimum height of 6 meters is required.


Load Requirement


For portable installations, a load capacity of 1.2 tons per square meter is needed. In cases of composite buildings, the load requirement is approximately 600-700 kg per square meter.

Facility Construction

Earthwork, Electrical Installation, Interior Design


Responsibilities of the customer
(Can be commissioned for construction)
 Interior Design: includes facilities such as restrooms, showers, counters, equipment shops, lighting, and flooring

Installation Features


Surfing Machine

Company :
 Korea Leisure Industry Development co., Ltd

CEO : Choi Yoon-seok

Address : 66, Seolgyenamu-gil, Daedeok-myeon, Anseong-si, Gyeonggi-do, Republic of Korea

Tel : +82-31-898-0898

Fax : +82-504-494-9617

Email : iyounseok@daum.net

Contact
+82-1533-8521


Copyright ⓒ Korea Leisure Industry Development co.,Ltd